Sheathing FAQ
Sheathing What is it?
Sheathing, which prevents the penetration of external heat, is covered with a heat insulating structure to protect internal temperature.
 
Menthol roll What Are the Benefits?
* Write your building from warm in winter, 50% will reduce the use of heating and cooling means, protected from the cold. So it makes a major contribution to the budget.
* The foundation and the roof of your building in case of wrapping this rate rises to 60%.
* Protects and extends the life of your building.
* Inhumanity, provide comfortable living conditions.
* Building your breath.
* Your building maintenance costs are reduced.
* Less fuel consumption and the environment by preventing pollution and develop a sense of responsibility towards future generations.
* Reducing the energy consumption and contributes to the national economy.
 
Sheathing Where is it applied?
Exterior building surfaces, roofs, the flooring, the garage, the unheated areas such as warehouses, cold storage and so on. It is applied to the areas.
 
Sheathing How?
Coating application is carried out in 7 steps.
1. Preparation of Surface Coating Attractions: they cleaned if the surface adhesion-reducing substances such as dust and oil. In addition, the area is cleaned beautifully brushed loss and blistering. Will adhere to the surface of the sheathing panels should be neat and clean.
2. Placing the Water Discharge Profile: Placing the water basmanprofil; Cross the plate the desired profiles to be used herein wrapping flooding (thickness) must be determined and arranged by.
3. Bonding of Heat Insulation Sheets: Sheets, making sure that no gap between wall pasted with adhesive.
4. Dowelling of Thermal Insulation Board: After the bonding process performance and continuity of thermal insulation boards durable thermal insulation panels as a way to continue is plugged.
5. Placing Corner View: wind in the corners and avoid the risk of separation may occur over time behind the plate with water effects and is properly placed corner to corner makes it easy to create profiles. Dilatation, eyedropper and windowsills profiles are used in appropriate areas.
6. Establishment of exterior plaster floors and furniture Placing a file: the first layer of plaster on insulation boards are discarded. Immediately after the first coat of plaster is placed gently on the reinforcement mesh embedded in the first floor. The second floor is made of plaster dry plaster.
7. Exterior Paint: When switching to painting process can be applied on exterior paint applied to mineral plaster or plaster to cover errors on only exterior paint can be applied.